THE SCENARIO
What this example assumes
This example assumes a three-car garage used for daily vehicles, recreation gear, and a workbench, with bare concrete and visible control joints.
SYSTEM DIRECTION
Recommended planning approach
A UV-stable full-flake system with careful joint detailing and texture selected for wet vehicles. The estimate would also confirm whether stem walls or steps belong in the scope.
Preparation checklist
- Measure all bays, steps, and optional stem walls
- Review moisture and previous sealer conditions
- Create a storage and parking plan for installation day
- Compare current savings and approved financing options
