THE SCENARIO
What this example assumes
The planning example assumes an uncoated builder-grade slab with normal tire marks, a few non-structural cracks, and wall-mounted storage that can remain in place.
SYSTEM DIRECTION
Recommended planning approach
A full-flake polyaspartic system with a neutral blend, mechanical diamond grinding, appropriate crack repair, and texture that balances wet-shoe traction with easy sweeping.
Preparation checklist
- Clear all floor-standing storage and vehicles
- Confirm crack and edge conditions during the estimate
- Select the flake blend before installation
- Plan alternate parking through the stated cure window
