THE SCENARIO
What this example assumes
The example assumes an older home with concrete dust, patched cracks, utility penetrations, and limited equipment access through the house.
SYSTEM DIRECTION
Recommended planning approach
Start with moisture and seepage history, then scope controlled mechanical preparation, crack and edge detailing, and a flake finish that hides workshop soil between cleanings.
Preparation checklist
- Discuss past leaks and active drainage concerns
- Remove floor storage and movable equipment
- Confirm grinding access and dust-control setup
- Protect or work around fixed utilities
